This blog is all about steps of grey structure during house construction in Pakistan & India. These steps of construction will tell you how to make a grey structure in a budget. Follow the steps in the same order to construct a budget house
This is where you don’t do clearing and grubbing as this is the house where you have to save the costs. Once excavation is done, you can remove the material.
Chalking is being done where all the rooms and areas are properly marked. Keep in mind that you should not make any changes at this stage. All the design has to be finalized before it. Chalking should be exact and re-verify it.
Next step is to excavation of foundation, and it needs to be rightly done.
Termite Proofing needs to be done and be careful that there are fumes which come out of it so be cautious.
Levelling of PCC needs to be done
Pour the PCC with a ratio of 1:2:4. Levelling is done after pouring. Cement is then sprinkled so that the grip can be made. Plastering of chips with the other walls is also done so that we can protect ourselves from seepage.
If you are done with the other steps, the next step is construction of foundations and filling of columns. Front boundary wall is also being done in it and also, we have filling of the foundations. Make sure that the foundation is filled once it is made but it is after the next step which is DPC.
This is a very important rather a mandatory step. If you don’t do it or don’t do it right, you will have a total mess in the house. Make a proper damp proof course.
Bricks are being put and the masala used for it is 1:4 so that the bricks are rightly bonded. When the wall goes over 5 ft, we use scaffolding.
This is where we need steel door frame installation. Normally it is done at this stage. On the other hand, if you are opting for wood door frames, that step is included in finishing of the house.
The next step is shuttering. There are two types of shuttering: Steel shuttering and wood shuttering. Normally you should opt for steel shuttering even if you are making a budget house.
This is the step which needs to be completed in one day. You have to make all the necessary arrangements. Also do check the weather forecast and if there is rain on that day, delay pouring of ceiling. You need to give cement a setting time. Also, water should stand on the ceiling for a while after one day because it helps to make the bond of cement and steel stronger.
Similarly process of wall construction of 1st Storey is started out. Once the house walls are constructed, pouring of ceiling of first floor is done.
Make sure that you use PV pipes. The pipes are being joined by heating so that there is no leakage. Also ensure that there is no leakage of pressure issues by making the water to run through. For sewerage pipes, check the level of the pipes and make sure that all the pipes are joined to the manhole.
Plastering is done and first we have rough plastering and then we have to make it smooth. The plastering process needs to be checked that there are no bubbles. First you do plaster of roof and then we cover the walls but before plastering the walls, Nero is sprinkled on them.
Last step becomes that flooring has to be made kutcha. In small houses, you have limited spaces for material handling, so you have to manage that properly.
I would end this blog over here where I have covered all the steps of grey structure of the house.